Your single point of reference for all your Geotechnical Inquiries

ST-120 tunnelling rig

The ST-120 tunnelling rig is the top of the Soilmec tunnelling range. Designed for the consolidation of large section tunnels it can be used for treatments up to a maximum of 21000 mm in one pass and 24000 mm with matching chuck. Heights of 10100 mm can be reached at the heading with the arms perfectly horizontal at 0°.

The main feature of the ST-120 positioner is the geometry of the two cradles that house the system of sliding blocks and telescopic arms, letting you work far from the face to consolidate (12000 mm) guaranteeing the greatest safety in operations underground. Furthermore, each of the single drilling arms is fully independent, driven by two separated power and remote control units.

The weight of the rig in operational layout, depending on the optional devices fitted and the configuration used, is between 110 and 120 tonnes.

Working radius at 0° mm 3600 ÷ 6600
H max from ground level at 0° mm 10100
Rated engine power kW 164 + (2x90)
Feed stroke mm 21000
Max hoist kN 84
Max torque daNm 1550
Clamping range mm 60-225
Track shoe width mm 800
Weight t 119

Contact:
SOILMEC SPA, Via Dismano, 5819, 47522 Cesena (Forlì Cesena) Italy.
Tel. +39 0547 319111, Fax. +39 0547 318548, e-mail: soilmec@soilmec.it
Country:
Italy
User Rating:
You must be registered to vote.