The economical analyses of different Chuquicamata open pit mine planning scenarios, indicate that the pit closure should occur at latest in the year of 2017. However, about 60,000 m of drill holes have demonstrated that below the pit bottom there is a potential ...
Reference: The South African Institute of Mining and Metallurgy, International Symposium on Stability of Rock Slopes in Open Pit Mining and Civil Engineering
<p>Rock slopes with heights approaching 1000 m are now being designed and excavated in various open pit mining and civil engineering projects around the world. The economic impact of excessively conservative designs or of failures in these slopes can be very ...
Reference: GeoEng 2000, An International conference on Geotechnical & Geological Engineering, 19-24 November 2000, Melbourne, Austrelia