Your single point of reference for all your Geotechnical Inquiries

Publications by [Cui Y.]

Total Items found:
<p>During the construction of the Bullet Train lines in Japan, several shallow tunnels were excavated in unconsolidated ground using the New Austrian Tunnelling Method (NATM). However, ground and tunnel settlements frequently occurred due to the low stiffness ...
Reference: Proceedings of the 18th International Conference on Soil Mechanics and Geotechnical Engineering, Paris 2013