THISSAVROS HYDROPOWER PLANT MANAGING GEOTECHNICAL PROBLEMS IN THE CONSTRUCTION (2004)

The Thissavros hydropower and pumped storage project on the Nestos river in northern Greece involved construction of a 172 m high rockfill dam and an underground power house with 300 MW installed capacity. Bedrock at the site consists of gneiss with complex geological structure and complicated hydrogeological conditions. On the right abutment, the dam partially rests on a large landslide and the toe of another large landslide extends into the plunge pool from the left bank. Initial excavations activated the dormant slides. Unloading, buttressing and drainage successfully stabilized the landslides. Core material for the dam is a silty sand and required special precautions in design and construction. Starting with an extremely rapid reservoir filling the dam has performed highly satisfactorily. The power house had to be excavated in a relatively unfavorable geological orientation but application of structural discontinuity analysis avoided wedge failures.

Reference:
Proceedings: Fifth International Conference on Case Histories in Geotechnical Engineering, New York, NY, April 13-17, 2004
Organization:
Public Power Corporation (PPC)
Greece, Athens
User Rating:
You must be registered to vote.