Your single point of reference for all your Geotechnical Inquiries

Publications by [Schanche K.]

Total Items found:
The first part of this article deals with the design and construction measures taken for the 880 m-head unlined pressure shaft. The latter part deals with a new concept for sealing of the concrete section at the base of the pressure shaft which has been introduced ...
Filed under: Tunnel Engineering -  Shafts
Reference: WATER POWER & DAM CONSTRUCTION, June 1987