Your single point of reference for all your Geotechnical Inquiries
Publications by [Kuijpers J. S.]
Total Items found:
Watson B. P.
,
Mosomane S. M.
et al.
The first crush pillars on the Bushveld Platinum mines were introduced at Union Section in 1978. Before the introduction of crush pillars, serious problems were experienced when stoping advanced to a point 30 m to 40 m on both sides of the centre gully. At ...
Filed under:
Mining Engineering -
Underground Mining
Reference:
6th International Symposium on Ground Support in Mining and Civil Engineering Construction, an ISRM-Sponsored Regional Symposium