Your single point of reference for all your Geotechnical Inquiries
Publications by [Kazilis N.]
Total Items found:
Koronakis N.
,
Kontothanassis P.
et al.
This paper describes the design methodology adopted for stabilization measures of a twin bored highway tunnel in Northern Greece, where severe cracking and translational displacements of the temporary support shell were observed. Cracks occurred due to an ...
Filed under:
Tunnel Engineering -
Difficult Ground
Reference:
Proceedings of the 30th ITA-AITES World Tunnel Congress, May 2004