Your single point of reference for all your Geotechnical Inquiries
Publications by [Taromi M.]
Total Items found:
Taromi M.
,
Eftekhari Α.
et al.
<p>The 10.6 km long Sabzkuh water conveyance tunnel is currently under construction in the High Zagros structural zone, located in western <br />Iran, through conventional (in section T1) and mechanized (in section T2) methods. The section T1 of the ...
Filed under:
Tunnel Engineering -
Difficult Ground
Reference:
International Journal of Mining and Geo-Engineering - IJMGE 52-2 (2018) 149-160