Babendererde S.
,
Hoek E.
et al.
The highly variable nature of deeply weathered Oporto granite posed significant challenges in the driving of the 2.3km long Cline and the 4km long S line of the Oporto Metro project. Two 8.7m diameter Herrenknecht EPB TBMs were used to excavate these tunnels ...
Filed under:
Tunnel Engineering -
Mechanized Tunneling
Reference:
Conference in Aveiro, Portugal, (2004)