Your single point of reference for all your Geotechnical Inquiries
Publications by [Liu J. H.]
Total Items found:
Wang R. L.
,
Cai Y. M.
et al.
<p>Shanghai Mass Rapid Line 4 shield tunnels cross the operating Line 2 with 1.03 m distance beneath the operating line 2, small angle and small turning radius. The tunneling-across was carried out without ground improvement. This project took great challenge ...
Filed under:
Tunnel Engineering -
Mechanized Tunneling
Reference:
Geotechnical Aspects of Underground Construction in Soft Ground – Ng, Huang & Liu (eds), 2009 Taylor & Francis Group, London