Your single point of reference for all your Geotechnical Inquiries

DESIGN AND CONSTRUCTION OF DRIVEN PILEFOUNDATIONS: LESSONS LEARNED ON THECENTRAL ARTERY/TUNNEL PROJECT (2006)

This study focused on an evaluation of static and dynamic load test data and a case study of significant movement of an adjacent building during pile driving.
Reference:
PUBLICATION NO. FHWA-HRT-05-159
Organization:
Office of Infrastructure Research and DevelopmentFederal Highway Administration
USA, Boston
User Rating:
You must be registered to vote.