Your single point of reference for all your Geotechnical Inquiries
GOTTHARD BASE TUNNEL, SWITZERLAND, EXPERIENCES WITH DIFFERENT TUNNELLING METHODS (2008)
At the time when it is completed, the Gotthard Base Tunnel in Switzerland, with a total length of 57 km, will be the longest railway tunnel in the world. The complete tunnel system consists of 153.3 km of access tunnels, shafts, railway tunnels, connecting galleries and auxiliary structures. Excavation of the main system started in 2002. More than 108 km, or more than 70% of the full 153.3 km of tunnel system, had been completed by the end of March 2008. Conventional tunnelling as well as excavation by TBM have been used. The experience gained is sufficient to allow conclusions to be drawn regarding each method.
Reference:
2º Congresso Brasileiro de Túneis e Estruturas Subterrâneas, Seminário Internacional “South American Tunnelling” - 2008
2º Congresso Brasileiro de Túneis e Estruturas Subterrâneas, Seminário Internacional “South American Tunnelling” - 2008
Organization:
AlpTransit Gotthard Ltd. Zentralstrase 5, CH 6003 Lucerne
Switzerland
AlpTransit Gotthard Ltd. Zentralstrase 5, CH 6003 Lucerne
Switzerland
User Rating:
You must be registered to vote.