OBSERVATIONS OF GROUND MOVEMENTS DURING TUNNEL CONSTRUCTION BY SLURRY SHIELD METHOD AT THE DOCKLANDS LIGHT RAILWAY LEWISHAM EXTENSION - EAST LONDON

THis paper describes minitoring results of ground movements due to slurry shield tunnelling on the Docklands Light Railway Lewisham Extension (hereinafter referred to as DLR). The DLR tunnels (twin bored tunnels) run from Island Gardens Station to Greenwich Station in East London, passing under the River Thames, a distance of around 4.2 km. THe construction of the tunnels, which were at shallow depth, needed an extensive appraisal of the potential damage induced by ground movements to the ovrlyign and underground structures. Therefore, in order to effectively minimize the ground movements, a slurry shield machine with a diamter of 5.85 m was employed. Careful control fo excavation was carried out during shield tunnel construction. As a result, the slurry shield tunnelling method in Woolwich and Reading Beds by well controlled monitoring was successfully conducted, leading to volume losses less than 1.0%

This paper focuses on the ground surface movements, particularly the ttransverse and longitudital settlement profiles, and volume losses during shield tunnel construction, in relation to the ground conditiions. Based on the monitoring results, combined with previous centrifuge model test results and other field monitoring data, practical methods to appropriately predict ground movements due to shield tunnelling are proposed.

Reference:
SOILS AND FOUNDATIONS Vol. 39, No 3, 99-112, June 1999, Japanese Geotechnical Society
Organization:
Nishimatsu Construction Co, Tokyo
Japan
User Rating:
You must be registered to vote.