Your single point of reference for all your Geotechnical Inquiries
Publications tagged with [dam break analyis]
Total Items found:
<p>Teton Dam failed during its first filling on 5 June 1976. The 405-ft high dam was designed and built using modern standards; therefore its failure received considerable scrutiny from engineering experts. Failure mechanisms suggested included hydraulic fracture, ...
Filed under:
Dam Engineering -
Dam Analysis & Design
Reference:
A thesis submitted in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE IN CIVIL ENGINEERING WASHINGTON STATE UNIVERSITY Department of Civil and Environmental Engineering December 2003