Your single point of reference for all your Geotechnical Inquiries

Publications tagged with [Slurry TBM]

Total Items found:
<p>The pipe jacking method is commonly used in Hong Kong for construction of underground cable duct crossings and stormwater drains. The method minimizes the disturbance to or interference with the activities and facilities on the ground surface. In this paper, ...
Reference: Geotechnical Aspects of Underground Construction in Soft Ground – Ng, Huang & Liu (eds), © 2009 Taylor & Francis Group, London
<p>This paper refers to the new planned Western Extension of the Athens Metro to Piraeus city. The railway consists of a 9.45m diameter and 8.2 km length tunnel and 7 stations. Tunnelling works are expected to be undertaken within a variety of lithological ...
Reference: 11th ACUUS Conference: “Underground Space: Expanding the Frontiers”, September 10-13 2007, Athens - Greece