Your single point of reference for all your Geotechnical Inquiries

Publications by [Benhalima M.]

Total Items found:
<p>In the construction of a tunnel, the characterization of the rock mass is performed in three different steps, in the pre-investigations, in the engineering geological forecast and in the tunnel mapping during construction. There has in previous work been ...
Reference: DEGREE PROJECT IN CIVIL ENGINEERING AND URBAN MANAGEMENT, SECOND CYCLE, 30 CREDITS STOCKHOLM, SWEDEN 2016