Your single point of reference for all your Geotechnical Inquiries

Publications by [Fernandez E.]

Total Items found:
The tunnels have been constructed following the NAT method, without top heading and benching, and therefore full face excavated with a total section of 80 m2, and tunnel pulls ranging from 2 to 4 m. The south section of both tubes, excavated in coluvial soils, ...