Your single point of reference for all your Geotechnical Inquiries

Publications by [Le Roux F. N. F.]

Total Items found:
This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid Rail System. The soil was decomposed shale and diabase from ...
Filed under: Tunnel Engineering -  Shafts
Reference: The Southern African Institute of Mining and Metallurgy Shaft Sinking and Mining Contractors Conference 2009