Your single point of reference for all your Geotechnical Inquiries

Publications by [Chan S.]

Total Items found:
Construction of the Canada Line Rapid Transit Project is currently underway in Vancouver, BC. The 19 km rapid transit system includes 6.6 km of cut and cover box structure – one of the longest cut and cover rapid transit tunnels in Canada. The design for the ...
Reference: The 14 th World Conference on Earthquake Engineering October, 12-17, 2008, Beijing, China