Your single point of reference for all your Geotechnical Inquiries

Publications by [Sun Y.]

Total Items found:
<p>Generally, two-pass lining systems are used for transportation tunnels constructed using the New Austrian Tunneling Method (NATM). The initial lining can support a significant portion of the long-term ground loads and thus reduce the design loads on the ...
Reference:
<p>A full dynamic analysis of the Bay Tunnel, considering the soil structure interactions, was performed to evaluate the performance of the tunnel final lining system during the design earthquake. This paper discusses the methods employed to perform the dynamic ...
Reference: Geotechnical Earthquake Engineering and Soil Dynamics (GEESD), GSP 181, 2008 ASCE