Your single point of reference for all your Geotechnical Inquiries
Publications by [Salimi Α.]
Total Items found:
Salimi Α.
,
Moormann C.
et al.
<p>With widespread increasing applications of mechanized tunneling in almost all ground conditions, prediction of tunnel boring machine (TBM) performance is required for time planning, cost control and choice of excavation method in order to make tunneling ...
Filed under:
Tunnel Engineering -
Mechanized Tunneling
Reference:
11th Iranian and 2nd Regional Tunnelling Conference “Tunnels and the Future” 2-5 November 2015