Your single point of reference for all your Geotechnical Inquiries
Publications by [Quick H.]
    Total Items found: 
    
                                    
                    Quick H.                    
                                
 ,                                      
                    Michael J.                    
                                
                 et al.
            
         
    
    
                <p>Different challenging tunnel projects in the downtown area of the city of Mainz in Germany are presented. These tunnels run parallel in a distance of 4 m to max. 50 m. The tunnels were built in soft soil conditions consisting of filling, clay and marl layers ...
            
    
        Filed under: 
                
                
                        Tunnel Engineering - 
                
                    Mechanized Tunneling
                
            
        Reference: 
        Geotechnical Aspects of Underground Construction in Soft Ground – Ng, Huang & Liu (eds), 2009 Taylor & Francis Group, London