DESIGN CONSIDERATIONS FOR THE DAMANG OPEN PIT EXPANSION (2006)

Abosso Goldfields Limited (AGL) is in the process of developing an expansion of their Damang Open Pit gold mine in Ghana. AGL acquired the Damang mine in January 2002, with SRK participating in the geotechnical investigation and design for the project since 2001. A deep resource drilling program, completed during 2004, intersected an extension of the orebody below the then planned final pit floor. A feasibility study has been completed to determine the economic extraction of this deep ore with an expanded pit shell.One of the main design challenges was to optimise the standoff distance between the final pit crest and the ETSF. This process had to consider maximum access to the resource without undue influence on or from the nearby tailings dam. A planned increase to the height of the dam wall was an additional factor in the design.
Reference:
The South African Institute of Mining and Metallurgy, International Symposium on Stability of Rock Slopes in Open Pit Mining and Civil Engineering
Organization:
SRK Consulting, Perth
Australia
User Rating:
You must be registered to vote.