Your single point of reference for all your Geotechnical Inquiries

REHABILITATION OF DAMAGED SOFT GROUND TUNNELS (2006)

Tunnelling induced deformations of a historic building, Chongsi Building, in Shanghai, China, are reported. The construction site located in Xuhui District, along the Metro line 11, and at the site the thickness of soft soil layer, soft clay and clayey silt, is about 30 m. The tunnelling method used is the earth pressure balance (EPB) shield tunnelling. The building with masonry structure was built about a century ago, and there were already considerable deformations. Considering this situation, the criteria for total and incremental deformations have been proposed; especially the twist criteria have been newly established and applied to the project. Controlling both the total and  incremental deformations is called Dual-control criteria (DCC). The measured maximum settlement, differential settlement, and twist during  tunnelling construction were 13.29 mm, 0.67 mm/m, and 3.23×10-5 rad/m respectively. Based on the monitoring results, the deformations of  the historic building during and after tunnel construction were very small and, causing no serious damage to the building, and it is considered  that the construction control is successful. 
Reference:
Journal of GeoEngineering, Vol. 1, No. 1, pp. 41-49, August 2006
Organization:
College of Engineering, National Chiao Tung University, Hsinchu, Taiwan
Taiwan
User Rating:
You must be registered to vote.