Your single point of reference for all your Geotechnical Inquiries

FINITE ELEMENT ANALYSIS OF A DEEP EXCAVATION: A CASE STUDY FROM THE BANGKOK MRT (2013)

Bangkok metropolitan located on thick river soft clay deposit has recently construction project on mass rapid transit underground railway (MRT). This paper presents a finite element study on the Bangkok MRT underground construction project. The Sukhumvit station construction was selected
as the case study. The numerical study focus initial input of ground condition and the constitutive soil models. The geotechnical conditions were carried
out based on soil investigation report. The parameters of constitutive models were determined and calibrated against the laboratory testing results. Finally, all finite element analysis results are compared with the real field investigations.

Reference:
Soils and Foundations Volume 53, Issue 5, October 2013, Pages 756–773
Organization:
Department of Ci vil Engineering, Faculty of Engineering, Chulalongkorn University, Bangkok, Thailand
Thailand
User Rating:
You must be registered to vote.