Your single point of reference for all your Geotechnical Inquiries
OPEN PIT MINE SCHEDULING – A CASE STUDY AT BOGOSO GOLD LIMITED (2006)
The main objective of this paper is to describe the process of mine scheduling as is being practiced At Bogoso Gold Limited in its mine planning activities.
The Bogoso area has a long and chequered mining history of both open pit and underground workings.
Open pit mining operations recommenced in 1990 to the present. Bogoso Gold Limited has moved from the exclusive use of mathematical models (excel spreadsheet) in its scheduling programs to a more sophisticated graphic-based method of scheduling – Minesched.
Reference:
5th FIG Regional Conference, Accra, Ghana, March 8-11, 2006
5th FIG Regional Conference, Accra, Ghana, March 8-11, 2006
Organization:
Bogoso Gold Limited
Ghana
Bogoso Gold Limited
Ghana
User Rating:
You must be registered to vote.