Your single point of reference for all your Geotechnical Inquiries

PERFORMANCE OF FULLY GROUTED PIEZOMETERS UNDER TRANSIENT FLOW CONDITIONS: FIELD STUDY ANDNUMERICAL RESULTS (2018)

This article presents new results from field tests and numerical simulations regarding the performance of fully grouted piezometers under transient flow conditions. The field observations show that using low-permeability grout for piezometer installation provides precise pore water pressure (PWP) measurements.This confirms previous findings on the fully grouted installation technique.

Reference:
Geotechnical Testing Journal, DOI: 10.1520/GTJ20170290
Organization:
Department CGM, École Polytechnique de Montréal, Canada
Canada
User Rating:
You must be registered to vote.