Your single point of reference for all your Geotechnical Inquiries
GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM, INTERIM IMPLEMENTATION GUIDE (2011)
This manual outlines the state-of-the-art and recommended practice for designing and constructing Geosynthetic Reinforced Soil (GRS) technology for the application of the Integrated Bridge System (IBS). The procedures presented in this manual are based on 40 years of State and Federal research focused on GRS technology as applied to abutments and walls.
Reference:
Federal Highway Administration, FHWA-HRT-11-026, 2011
Federal Highway Administration, FHWA-HRT-11-026, 2011
Organization:
FHWA
USA
FHWA
USA
User Rating:
You must be registered to vote.