Your single point of reference for all your Geotechnical Inquiries

DRILLED SHAFT FOUNDATIONS FOR THE KCICON MISSOURI RIVER BRIDGE (2009)

The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cable-stayed bridge is currently under construction and will span the Missouri River on I-29/35 in Kansas City, Missouri. The design-build process for the foundation work on this project has been successfully implemented as a result of cooperative efforts between the foundation designers and the constructors to develop a constructible design.
Reference:
Deep Foundations Institute 34th Annual Conference on Deep Foundations, Conference Proceedings 2009
Organization:
Dan Brown and Associates, USA
USA
User Rating:
You must be registered to vote.