Your single point of reference for all your Geotechnical Inquiries

SCOUR AT BRIDGE FOUNDATIONS ON ROCK (2012)

This report presents a methodology for estimating the time rate of scour and the design scour depth for a bridge founded on rock. The report also includes design and construction guidelines for application of the methodology.
Reference:
NCHRP Report 717, TRB
Organization:
Transportation Research Board, USA
USA
User Rating:
You must be registered to vote.