INSTALLATION OF A HDPE CURTAIN WALL WITH SHEETPILE TIE IN ON BOTH ENDS

The plans for eliminating the off-site migration of a non-aqueous phase liquid (NAPL) from a refinery into a nearby river included the installation of a High Density Polyethylene (HDPE) curtain wall and an underdrain system. This paper briefly describes the construction methods utilized during this project, specifically HDPE curtain wall installation thru a bentonite slurry and tie-in to the existing sheet pile wall