Your single point of reference for all your Geotechnical Inquiries
Publications tagged with [drilling parameters]
Total Items found:
Tardaguila I.
,
Celada B.
et al.
The inspection of the waste chips has consisted not only in the weight in the belt but also in the size and shape of the waste. Finally, the drilling parameters controlled were: - rate of advance - time of excavation - weight of material in the belt - thrust ...
Filed under:
Tunnel Engineering -
Mechanized Tunneling
Reference:
ITA-AITES World Tunnel Congress 2007 - Underground Space - the 4th Dimension of Metropolises