Your single point of reference for all your Geotechnical Inquiries

Settlement Points (Borros Type) - Model 1950

The purpose of the heave/settlement points is to measure vertical movements in foundation soils during and subsequent to construction. The heave / settlement point consists of a three-prong anchor, a ΒΌ" standard inner pipe, and a 1" standard outer pipe. The pipes are assembled in sections and fastened together with standard couplings to the required anchor depths.


Contact:

Geokon, Incorporated, 48 Spencer Street, Lebanon, New Hampshire, 03766 · USA. Tel.: 1(603)448-1562, FAX: 1(603)448-3216, e-mail: info@geokon.com

Country:
USA
User Rating:
You must be registered to vote.