Your single point of reference for all your Geotechnical Inquiries
Tunnel boring machine 'Blanche' blasts through at wastewater treatment plant
The Tunnel Boring Machine (TBM) called 'Blanche' at Watercare's Army Bay wastewater treatment plant has travelled 600 metres— a third of the way on its journey from the plant to the transition point, 500 metres into the sea.
The machine isn't travelling fast, between 28-35 mm per minute, and has covered almost two kilometres so far but it's doing a great job of cutting through the ground, laying a new wastewater pipe. Watercare projects manager, John McCann says everything is on track.
User Rating:
You must be registered to vote.