Your single point of reference for all your Geotechnical Inquiries

Geotechnical Egineering News tagged with [electrified tunnel]

Total Items found:
THE HINDU   04 July 2019   India  
<p>The 6.6-km tunnel is built in a record 43 months at a cost of ₹460 crore<br />The South Central Railway (SCR) has added yet another feather in its cap by commissioning the longest electrified tunnel of 6.6 km built at a total cost of ₹460 crore between ...
Filed under: Construction News