Your single point of reference for all your Geotechnical Inquiries
Publications by [Bruin W. T.]
Total Items found:
Adaska W. S.
,
Bruin W. T.
et al.
This paper presents the closure plan including a combination cement - bentonite slurry wall and jet grouting along the perimeter of the basing. The sludge and contaminated soil beneath the basin were solidified in place using a specially developed soil mixing ...
Filed under:
Environmental Geoengineering -
Contaminate Mitigation and Treatment
Reference:
Cement industries solution to waste management, Canada, 1992