REMEDIATION OF OIL REFINERY SLUDGE BASIN (1992)
This paper presents the closure plan including a combination cement - bentonite slurry wall and jet grouting along the perimeter of the basing. The sludge and contaminated soil beneath the basin were solidified in place using a specially developed soil mixing technique
Reference:
Cement industries solution to waste management, Canada, 1992
Cement industries solution to waste management, Canada, 1992
Organization:
Geo-Con Inc, USA
USA
Geo-Con Inc, USA
USA