Your single point of reference for all your Geotechnical Inquiries

Publications by [Cho H.]

Total Items found:
Han S. , Cho H. et al.  
In tunnel construction, overcut along with undercut estimation is one of the most important factors to be considered before proceeding to the next operation. It is currently analyzed based on sparsely sampled points surveyed using a total station, but not ...
Reference: 012 Proceedings of the 29th ISARC, Eindhoven, The Netherlands
As every construction project is quite different according to the type of construction, 3D-representations on design, estimation, construction, and management also need to be different. While the 3D-approach has been widely applied to building projects, it ...
Reference: 2012 Proceedings of the 29th ISARC, Eindhoven, The Netherlands