Your single point of reference for all your Geotechnical Inquiries
Publications by [Ulrich D.]
    Total Items found: 
    
                <p>Main construction work for the Florentine “Nodo di Firenze” high-speed railway hub started in 2010. The tunnel boring machine (TBM) transitions through extremely variable geological terrain and excavations along the entire length of the hub ...
            
    
        Filed under: 
                
                
                        Tunnel Engineering - 
                
                    Tunnel Monitoring
                
            
        Reference: 
        World Tunnel Congress 2013 Geneva Underground – the way to the future!G. Anagnostou & H. Ehrbar (eds)© 2013 Taylor & Francis Group, London ISBN 978-1-138-00094-0
     
                         
                     
                     
                     
                 
                            