Your single point of reference for all your Geotechnical Inquiries

Publications by [Ulrich D.]

Total Items found:
Main construction work for the Florentine “Nodo di Firenze” high-speed railway hub started in 2010. The tunnel boring machine (TBM) transitions through extremely variable geological terrain and excavations along the entire length of the hub ...
Reference: World Tunnel Congress 2013 Geneva Underground – the way to the future!G. Anagnostou & H. Ehrbar (eds)© 2013 Taylor & Francis Group, London ISBN 978-1-138-00094-0