Your single point of reference for all your Geotechnical Inquiries
Publications by [Zhang H.]
Total Items found:
<p>The Tugun Bypass Tunnel in Gold Coast, Australia was constructed using diaphragm walls with the top-down cut-and-cover method to allow simultaneous construction of an airport runway extension above the tunnel, whilst excavation of the tunnel continued underneath. ...
Filed under:
Soil Mechanics -
Numerical Methods
Reference:
Geotechnical Aspects of Underground Construction in Soft Ground – Ng, Huang & Liu (eds), © 2009 Taylor & Francis Group, London