Your single point of reference for all your Geotechnical Inquiries

THE CONSTRUCTION OF BORED PILES SOCKETED INTO SHALE AND SANDSTONE (1998)

This document commences with design sections covering the basic assumptions relating to construction that are involved with modern design methods.
Reference:
Australian Geomechanics - Dec 1998
User Rating:
You must be registered to vote.