Your single point of reference for all your Geotechnical Inquiries

GEOLOGICAL ENGINEERING INVESTIGATIONS IN SITU AND GEOTECHNICAL ENGINEERING SOLUTIONS TO SUPPORT THE REALIZATION OF THE THIRD LOT OF THE WATER TREATMENT PLANT IN CALABAR, NIGERIA (2008)

This paper shows the results of the Geological-Engineering investigations in situ and the Geotechnical-Engineering solutions to support the building of the third lot of the Water Treatment Plant, located in Calabar, Cross River State, Republic of Nigeria.

Reference:
Vol. 13, Bundle J
Organization:
Telematic University of Rome (Italy)
Nigeria
User Rating:
You must be registered to vote.