DESIGN AND CONSTRUCTION OF NATM UNDERGROUND STATION TUNNEL BY USING THE FOREPOLING METHOD IN DIFFICULT CONDITIONS FOR ATHENS METRO (2005)

This paper describes the detailed engineering design process in terms of the relative geotechnical interpretation stage, the subsequent multistaged numerical simulation steps by using SOFISTIK software, the critical decision making points and the actual results achieved during the construction of Ag. Savas underground station tunnel for Athens Metro.
Reference:
Proceedings of the 31th ITA-AITES World Tunnel Congress, May 2005
Organization:
Omikron Kappa Consulting Ltd, Athens, Greece