Your single point of reference for all your Geotechnical Inquiries

THE ALTERNATE TECHNICAL CONCEPT PROCESS FOR THE FOUNDATIONS AT THE NEW MISSISSIPPI RIVER BRIDGE, ST. LOUIS (2011)

The Massman - Traylor - Alberici team developed a redesigned foundation system for the main pylon and anchor foundations which utilizes their equipment and experience along with field load test measurements to optimize the foundations.
Reference:
Proceedings of the 36th Annual Conference on Deep Foundations, 2011, Boston,
Organization:
Dan Brown and Associates, USA
USA
User Rating:
You must be registered to vote.