Your single point of reference for all your Geotechnical Inquiries
Publications by [Pliego J. M.]
    Total Items found: 
    
                                    
                    Pliego J. M.                    
                                
 ,                                      
                    Esteras M.                    
                                
                 et al.
            
         
    
    
                The 570 m long Tarifa Experimental Gallery has allowed the investigation of three of the five flysch units involved in the future tunnel of Gibraltar. This Tunnel will have a length of 38 km approximately and will cross the Strait. For this reason, the results ...
            
    
        Filed under: 
                
                
                        Tunnel Engineering - 
                
                    Tunnel Monitoring
                
            
        Reference: 
        International Conference on Geothecnical & Geological Engineering, Melbourne
     
                         
                     
                     
                     
                 
                            