Your single point of reference for all your Geotechnical Inquiries
Publications by [Esteras M.]
Total Items found:
Pliego J. M.
,
Esteras M.
et al.
The 570 m long Tarifa Experimental Gallery has allowed the investigation of three of the five flysch units involved in the future tunnel of Gibraltar. This Tunnel will have a length of 38 km approximately and will cross the Strait. For this reason, the results ...
Filed under:
Tunnel Engineering -
Tunnel Monitoring
Reference:
International Conference on Geothecnical & Geological Engineering, Melbourne