Your single point of reference for all your Geotechnical Inquiries

TBM DESIGN CONSIDERATIONS, SELECTION OF EARTH PRESSURE BALANCE OR SLURRY PRESSURE BALANCE TUNNEL BORING MACHINES

The focus of this paper is too list the required information for the design of a TBM and focus on the selection of the EPB or Slurry TBM method of face support based on the conditions of the project, from geology, alignment restrictions and local knowledge / support

Reference:
Organization:
Lovat Inc, Canada
Canada
User Rating:
You must be registered to vote.