PERIMETER CONTROL AT ORAPA DIAMOND MINE (2008)
This paper presents results of a project undertaken to monitor, review and optimize the trim blasting and pre-splitting processes at Orapa Diamond Mine in Botswana. The project was specifically incepted to improve the final wall conditions, which continued to deteriorate due to persistent over-break during blasting. The paper also analyses the results obtained against a benchmark of results taken prior to project implementation.
    