Your single point of reference for all your Geotechnical Inquiries
Publications tagged with [mechanical excavation]
    Total Items found: 
    
                                    
                    Contreras A. C.                    
                                
 ,                                      
                    deCabo M.                    
                                
                 et al.
            
         
    
    
                The tunnels have been constructed following the NAT method, without top heading and benching, and therefore full face excavated with a total section of 80 m2, and tunnel pulls ranging from 2 to 4 m. The south section of both tubes, excavated in coluvial soils, ...
            
    
        Filed under: 
                
                
                        Tunnel Engineering - 
                
                    Sprayed Concrete Lining
                
            
        Reference: