Your single point of reference for all your Geotechnical Inquiries
Publications tagged with [full face]
Total Items found:
Contreras A. C.
,
deCabo M.
et al.
The tunnels have been constructed following the NAT method, without top heading and benching, and therefore full face excavated with a total section of 80 m2, and tunnel pulls ranging from 2 to 4 m. The south section of both tubes, excavated in coluvial soils, ...
Filed under:
Tunnel Engineering -
Sprayed Concrete Lining
Reference: